03.08.2018

Are we different at BLÜCHER? For sure we are!


And why? Well, we care about every little detail involved in your project, and we are aware of your challenges.
Because when you think about your project, your drainage system maybe impact only 1 - 2 % of the total investment. But the outcome of your choice impact your production, hygienic level every single day.


With our solution, we see examples of gaining up to 1 hour more production time – daily! It usually adds up to 220 – 250 production hours on a yearly basis.
These facts alone might generate you interest in getting your drainage and choice of material scaled right for your needs.
Furthermore, these are added benefits who are all coming for FREE (if you make the right choices):

- Time savings
- Less water consumption
- Higher safety environment for your employees
- Higher overall hygienic level

The problem is what you seal and install in concrete, is not that easy to change afterwards.


“Dry floors make you forget about drainage and the great drainage system you got whereas wet floors make you think about drainage every day.”
                              Torben Grønborg, Area Sales Manager at BLÜCHER


So please contact us from the beginning of your project.


Trusted by many players worldwide we made these channels (picture) for a Global Poultry Company.
See full reference list here.


So try challenge us for your next local project – we are different!
Contact us.


Roof drains

Stainless steel roof drains for all types of flat roofs with bitumen or single ply roof membrane. Suitable for both gravity and siphonic applications

See product catalog